Robust optimization for resource-constrained project scheduling with uncertain activity durations

Book Contribution - Book Chapter Conference Contribution

The purpose of this paper is to propose models for project scheduling when there is considerable uncertainty in the activity durations, to the extent that the decision maker cannot with confidence associate probabilities with the possible scenarios. Our modeling techniques stem from robust optimization, which is a theoretical framework that enables the decision maker to produce solutions that will have a reasonably good objective value under any likely input data scenario. We develop and implement a scenario-relaxation algorithm and a scenario-relaxation-based heuristic. The first algorithm produces optimal solutions but requires excessive running times even for medium-sized instances; the second algorithm produces high-quality solutions for medium-sized instances and outperforms two benchmark heuristics. © 2011 IEEE.
Book: 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM)
Pages: 101 - 105
Number of pages: 5
ISBN:9781457707391
Publication year:2010
BOF-keylabel:yes
IOF-keylabel:yes
Authors from:Higher Education