Technical studies OW plan Ostend - wave penetration - Physical tests phase 1

The adoption aims to determine the throughput rate and on the strength of a storm wall. The tests cover the overtopping problems on the quays of the port of Oostende which is determined from an assessment that there is currently an unsafe situation when extreme storms (very high risk of flooding). From the test results of these formulas to be deduced which allow to overtopping can be calculated than the optimum height of the storm wall for similar configurations. The forces will be used to dimension the necessary foundation and calculate the structural stability of the storm wall

Date:1 May 2010 →  31 Jan 2011
Keywords:wave penetration physical tests
Disciplines:Construction engineering, Water engineering, Earthquake engineering, Wind engineering, Geotechnical and environmental engineering