< Back to previous page
Project
Monitoring the effect of mitigating measures in the Kempense Kleiputten in Beerse (EVINBO)
In 2015, we made a monitoring plan to follow up the effect of mitigating measures against acidifying deposition, in the framework of an environmental permit for a company close to the habitat directive area Kempense Kleiputten. In 2017-2018, the first monitoring round for this project was carried out (T0).
Now, the company asks if we can also carry out the second monitoring round, and more specifically the follow-up of the acidification sensitive aquatic habitats within the zone of the presumed deposition plume. These aquatic habitats should be monitored every three years. We determine the physico-chemical status, carry out a vegetation survey, determine the conservation status of the ponds, and analyse the epiphytic diatoms.
Now, the company asks if we can also carry out the second monitoring round, and more specifically the follow-up of the acidification sensitive aquatic habitats within the zone of the presumed deposition plume. These aquatic habitats should be monitored every three years. We determine the physico-chemical status, carry out a vegetation survey, determine the conservation status of the ponds, and analyse the epiphytic diatoms.
Date:1 May 2021 → 31 May 2022