< Back to previous page

Project

CRUMBit Phase 2.

The main aim of this research is to identify the barriers preventing the use of recycled tire rubber in Belgian asphalt road surfaces and to develop market-ready solutions that can be presented to road authorities. The main expected results within the second phase of this project are the following: scaling up of the rubber modified bitumen to asphalt applications, leaching tests, analysis of the recyclability and an LCA/LCC study of rubber modified asphalt. The final work package includes the necessary follow-up steps to install the final product in one or more test tracks and finally get it approved for the Belgian market.
Date:1 Sep 2020 →  31 Aug 2023
Keywords:LIFE CYCLE ASSESSMENT, RECYCLING, ASPHALT, RUBBER
Disciplines:Infrastructure engineering and asset management, Destructive and non-destructive testing of materials